Inter Pipeline’s $60-million 3-tank expansion project in Kerrobert, Saskatchewan is yet another successful project for TIW.
The expansion project is now Inter Pipeline’s largest crude oil storage location and was highlighted in a YouTube video posted on Inter Pipeline’s channel. The time lapse video runs just under 2 minutes and gives the viewer a tour of the monumental site in the west-central region of the province.
Time Lapse Video
Press play and you’ll learn the following statistics about the project:
- 250,000 tons of clay and gravel were used to build the foundation
- Sitting on top of the foundation is a deep network of stone columns that support the tanks
- Vapors and emissions are controlled using a sandborn aluminum roof, which floats on top of the oil
- 1,845 tons of steel were used to construct the tanks
- 170,000 man hours were spent
- The three tanks hold 400,000 barrels of oil (combined total)
- Each of the three tanks can weigh up to 20,000 tons fully loaded. They stand over 15 metres tall and spans a massive 42 metres wide
Thanks to a comprehensive planning strategy and solid partnerships with several sub-contractors, we were able to successfully complete the project on an accelerated timeline, while maintaining our high standards for quality, workmanship and safety.
More Details: Read our Wrap-Up