Working on an accelerated timeline, TIW designed, fabricated, supplied and constructed three (3) 42-metre (137 feet) diameter, API 650 column-supported roof tanks for Inter Pipeline’s $60 million Kerrobert facility. TIW completed the project within 10 months – ahead of schedule despite a few challenges. Located in the heart of west-central Saskatchewan, each tanks hold a combined total of 400,000 barrels of oil, and each is topped with a sandborn aluminum roof to control vapors and emissions.